Company

Abo Rugia Mining

Category

Water infrastructure

Route

Gihaid/Shendi to Wad Bushara

Length

Approximately 70 km

Water sources

Four artesian wells

Explore Abo Rugia Mining

Water Supply Infrastructure

A 70 km water-transfer system connects the Gihaid/Shendi area in River Nile State with the operational area around Wad Bushara, serving mining operations and surrounding communities.

Project Overview

The long-distance system transferred water to the mining plant in a location where reliable water access was a substantial operational requirement.

  • Approximately 70 km transfer route
  • Water storage and distribution infrastructure
  • Connection to the Wad Bushara operational area

Community Relevance

The same infrastructure supported practical water access beyond the plant.

  • Water provision to Wad Bushara and neighboring communities
  • Tanker support for remote locations
  • Livestock watering basins along the route

Related Support

Company machinery also supports dam rehabilitation, road access after rainy seasons, and urgent community needs.

Project Media

Project Media

Water pipeline installation

Pumping equipment work

Water reservoir